Project: Waste Water Treatment Plant – Great Falls

Photo 01 Photo 02 Photo 03    

General Contractor: Sletten Construction
Architect: Neil Consultants
Engineer: Neil Consultants
Project Manager: Pat Bahnmiller
Plumbing: John Schug
Description:

Treatment Plant included process piping between two anaerobic digesters with the sludge routed to two new centrifuges. The boiler system provided is a two-gas system capable of burning natural gas or a digester gas. The project included a new HVAC system provided through air handlers.